The full power of TDengine, now free forever for up to 5,000 tags.

Explore More

Industrial Connectivity

Practical guides to industrial protocols, data collection, OT/IT connectivity, and industrial data integration.

Industrial Data Integration Architecture: Connecting PLCs, SCADA, and Historians

A plant can have a functioning SCADA system, a trusted historian, and years of equipment data, yet still struggle to give another application the information

Juno Qiu

November 9, 2026 | Industrial Connectivity

LIMS and Historian Integration: Match Samples to Process Conditions

To associate a laboratory result with historian process data, identify the sample and sampling location, then retrieve the relevant process records using the actual collection

Juno Qiu

November 9, 2026 | Industrial Connectivity

Calculate Usage from Historian Totalizers After a Rollover or Reset

Calculate Usage from Historian Totalizers After a Rollover or Reset Subtracting two totalizer readings gives period usage only when the counter’s meaning and continuity are

Juno Qiu

November 9, 2026 | Industrial Connectivity

How to Size an Industrial Edge Data Buffer

An edge buffer can hold collected records while a downstream connection is unavailable. Its useful outage duration depends on the actual data written, free disk

Juno Qiu

November 4, 2026 | Industrial Connectivity

PLC Data Collection Without Overloading Controllers

A new historian or analytics application may need only a few PLC tags, but it joins every other client already asking the controller for data.

Juno Qiu

November 4, 2026 | Industrial Connectivity

Time Synchronization for Industrial Data Collection

Two plant systems can record valid measurements and still disagree about the order of events. If their clocks differ by three seconds, a historian trend

Juno Qiu

November 4, 2026 | Industrial Connectivity

Consistent PLC Data Snapshots: Are Related Values from the Same State?

A dashboard can display a batch ID, product count and machine state that were each read successfully but did not belong to the same moment.

Juno Qiu

November 3, 2026 | Industrial Connectivity

How to Validate Historian Backfill Without Losing Historical Context

A backfill job can finish successfully and still leave a destination with an incomplete or misleading history. A connector may have transferred every record it

Juno Qiu

November 3, 2026 | Industrial Connectivity

Integrating Historians Across Multiple Sites: Architecture Decisions and Tradeoffs

Two plants can produce the same product and still have very different histories. One may use a long-established historian with years of process data; another

Juno Qiu

November 3, 2026 | Industrial Connectivity

Modbus Register Mapping for Industrial Data Collection

A successful Modbus response proves that a device answered a request. It does not prove the returned number is the pressure, temperature or energy value

Juno Qiu

November 2, 2026 | Industrial Connectivity